PHASE 07 · TEST & CERTIFICATION

Test & certification.
Prepared for CE marking, without surprises.

You arrive with working prototypes. You leave with a verified product, pre-compliance results and the technical documentation you need to complete the conformity assessment and affix the CE marking.

Henrik Andersen development loop: enter anywhere, stay as long as you need, exit anytime

At a glance.

You bring
  • Working prototypes
  • Requirements and a test plan
  • Your target markets
  • Or a product that failed a test
I do
  • Verification and validation
  • EMC pre-compliance
  • Safety and radio pre-tests, test-lab coordination
  • Technical documentation and draft EU DoC
You get
  • Test reports
  • Pre-compliance results
  • Technical documentation
  • Draft EU Declaration of Conformity

What is included.

Ten building blocks. Take them all, or just the ones you need.

EU CYBER RESILIENCE ACT

Cybersecurity verification.

For internet-connected radio equipment, the cybersecurity requirements of the Radio Equipment Directive (Delegated Regulation (EU) 2022/30) apply since 1 August 2025, with the EN 18031 series as harmonised standards. From 11 December 2027 the EU Cyber Resilience Act (Regulation (EU) 2024/2847) adds requirements for most products with digital elements, and its reporting obligations already apply from 11 September 2026. I verify and document the security functions alongside the other tests.

Whether and how these rules apply depends on your product. This is engineering support, not legal advice.

HOW EVIDENCE IS PLANNED

Verification and validation management.

Evidence is planned and produced to show that every requirement is met (verification) and that the product fulfils its intended use (validation), from simulation to your acceptance.

Verification and validation management. Five test levels rise in realism: software in the loop, hardware in the loop, system test, qualification (EMC, climate, endurance and safety) and acceptance (your scenarios and the intended use). The first four are verification, is the product built right; acceptance is validation, is it the right product. Below: a traceability example from requirement REQ-014, battery life of at least 12 hours, to test case TC-031, a hardware-in-the-loop discharge profile, to a pass with stored evidence, and an example evidence coverage of 38 of 40 requirements. Principles: planned up front, every requirement traced, real conditions, your acceptance. Right: the typical outputs, test plans, SIL and HIL results, qualification reports and acceptance records.

What you get.

Verification report Against the SRD
EMC pre-compliance Emission and immunity
Safety and radio LVD, RED, EN 18031 evidence
Materials RoHS and REACH
Technical file Supports your conformity assessment
EU DoC Draft, signed by you as manufacturer

For formal compliance testing I work closely with test laboratories such as SGS Belgium (CEBEC), BGEMC, TÜV Rheinland, TÜV SÜD and cetecom advanced. The choice of laboratory stays yours.

Duration

Agreed in your proposal

Enter with

Working prototypes

Exit with

Evidence for CE marking

Payment

After your approval

Where to next.

Continue with me through the next phases to start of production, or leave with what you came for.

Previous phase06 PrototypeWorking units, brought up, debugged and measured. Next phase08 Production readyDFM, test jig, EMS selection and approved samples.

CONTACT

Ready to start at phase 07?
Or hand over the complete development? Just ask.

A new product to develop from scratch, a design that needs a second look, or a prototype that does not work yet: a few lines are enough to start.

  • A personal reply within one working day
  • No cost and no commitment up front: you only pay for work you approve
  • Your idea stays confidential, NDA on request (how I keep your project confidential)

Write to me

info@siliconmeetscode.com
Write an email

Helpful to mention: what the product does, where it is today, and your timeline. The email opens with these questions ready to fill in.

Working from Belgium and Germany with clients across Europe and Asia